The integrator project going in a timely manner, there have been several advances, but I left my team that work hard, because I had a lot of work at my job, I think they're a bit stressed.

The progress has been made in the structure and the programming, calibrate the RGB sensor, but progress is needed in the design.,and the sensor was tested with servo motor and works great, just slightly adjust the rotation.

The water pumps consume much amperage will be in service but only few seconds, with good voltage source pumps work well and fill the glasses quickly.

Refine several details still missing but I will finalize the project.I hope I'm not stressed by the end of the semester with the delivery of the project and finish it in time allotted.